Model-Based Estimating

Enhance project insight and potential for value-工程 opportunities.

Model-based estimating enhances project insight and value-工程 opportunities.

Information embedded in the BIM design models allow the integrated design-build team to quantify the 3D design almost instantaneously at every stage of design development. This produces faster and more accurate estimates that give owners the ability to visualize 3D color-coded model information, compare estimates of different design options, make better-informed decisions, run bid analysis during procurement phase, change analysis over time, and reduce project costs.

Director – Virtual 建设

相关项目

Representative Clients

Clarifier tank and process piping

The planning and coordination of the construction interface between the new WWTP and our operating production facility have been very effective. The BC-澳门足彩app team operates in an open and collaborative environment. 设计 or field construction challenges are addressed in a direct and objective manner with all parties focused on a common goal of successful project delivery and start-up."

特里·法里斯
Director of 工程, 布什的兄弟 & 公司
View from above the exterior storage tanks

The planning and coordination of the construction interface between the new WWTP and our operating production facility have been very effective. The BC-澳门足彩app team operates in an open and collaborative environment. 设计 or field construction challenges are addressed in a direct and objective manner with all parties focused on a common goal of successful project delivery and start-up."

特里·法里斯
Director of 工程, 布什的兄弟 & 公司